March 17

Annual Maintenance

2  comments

I have been taking advantage of an excess of free time (a long story) and some good weather to get a jump on this year's boat jobs. Here is my original post on what needed doing. Here's where I am at:

1. Get the #&!@&ing outboard working: I have spoken with Al at the marina and for a few hundred bucks I will have a new bracket and a working outboard very soon. Huzzah!

2. Sand and paint the bottom: Done and dusted and I have blue paint under my nails to prove it.

3. Clean and grease the winches: Still needs doing

4. Touch up the wood: Half-way done

5. Clean and Polish the Fiberglass:  Getting started

6. Replace the boom vang eye on the mast:  Check

7. Re-bed the Halyard Clutch: Done

8. Get up the mast and fix the wind indicator: Still need to do.

9. Inspect the rigging: Not yet.

10. Install Traveler: Not doing as removing the old one will cause a lot of problems.


Tags


You may also like

The Best Way to Watch The Newport Folk Festival

Was sad to miss this year’s Newport Folk Festival, especially after hearing the report on NPR today. It sounded like the tribute to Joni Mitchel was very moving, and hearing her sing “Both Sides Now” with a supporting cast organized by Brandi Carlisle, made me tear up. Newport Folk Festival By Sea We never got

Read More